- 1x baby sweater (like the 5 hour baby sweater)
- 2x shawls (from eingirni, Icelandic 1 ply wool)
- 1x mittens for Clint
- 1x slippers for Clint
- 2 pair socks
- 1x crochet sweater for me
- 1x tank top/skirt for Ása (baby cotton)
- 16+ washcloths, facecloths, bibs etc. (things that take less than a skein of kitchen cotton
- 3x denim bibs
- 1x pedal bib
The list is a lot longer than I had assumed. But still not too long. I could do this in a half a year, providing I'm spending at least 2 hours a day knitting. It'll be interesting to see at the end of the year how many projects are left on the list.
1 comment:
That really isn't much. At least not in my book. Admirable restraint, I'd say. ;-)
Post a Comment